|
In March of 1999, Orange County initiated a corridor analysis of approximately a one-mile corridor intended to improve traffic flow from Clarcona-Ocee Road to Kennedy Boulevard. Presently existing in this corridor is All American Boulevard, which extends from Edgewater Drive North, then curving East to connect to Kennedy Boulevard at Forest City Road. The purpose of the corridor analysis was to identify a conceptual corridor for the roadway that would adequately meet the area's transportation demands. As a follow-up to the original corridor analysis, a more detailed preliminary engineering report study has now been performed. This preliminary engineering report study was kicked off in May of 2002 and was completed in August 2003. This report will identify and document the process by which the preferred alignment has been selected. |